Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Omori, Kazuki; Yamauchi, Sho; Yanagibashi, Futoshi; Sasaki, Shunichi; Wada, Takuya; Suzuki, Hisanori; Domura, Kazuyuki; Takeuchi, Kenji
Nihon Hozen Gakkai Dai-18-Kai Gakujutsu Koenkai Yoshishu, p.245 - 248, 2022/07
Tokai Reprocessing Plant (TRP), which is shifted to decommissioning stage, stores large amount of high-level radioactive liquid waste (HLLW). Although TRP is implementing vitrification of HLLW to reduce the risks related to HLLW storage, additional 20 years are required to complete vitrification of HLLW. Therefore, TRP is implementing safety countermeasure related to seismic resistance of HLLW storage facility as one of the top priorities. The results of the seismic evaluation indicate that although the facility itself is seismically resistant, there is a risk of insufficient binding force acting between the facility and the surrounding ground. Thus, replacement of the surrounding ground with concrete is performed. Since the countermeasures, to protect existing buries structure and coordinate with the other construction projects around the site, are required, the dedicated team was setup to handle the process and safety management of the concrete replacement construction.
Yoshinaka, Kazuyuki; Suzuki, Masafumi*
Gijutsushi, (659), p.4 - 7, 2021/11
The regulatory standards for nuclear facilities were revised, reflecting the lessons learned from Fukushima-Daiichi NPS accident. Many requirements for safety measures, in case there are natural disaster or severe accidents, are added for nuclear fuel cycle facilities. Aiming achievement of the nuclear fuel cycle, various safety measures for conforming to new regulatory standard and improving, have been taken at Rokkasho reprocessing plant.
Hasegawa, Toshinari; Fukaya, Yuji; Ueta, Shohei; Goto, Minoru
Proceedings of 28th International Conference on Nuclear Engineering (ICONE 28) (Internet), 5 Pages, 2021/08
Burnable poison (BP) credit concept has been proposed as a criticality safety measure for commercial high temperature gas-cooled reactor (HTGR) fuel fabrication, so we estimated manufacturability of the BP-mixed UO kernel for the practical use of the concept. As a BP, boron, gadolinium, erbium, and hafnium are investigated. Boron mixed fuel kernels are fabricated by mixing boric acid powder with UO powder. In the case of the other BPs, BP nitrate powder is mixed with UO powder. In order to confirm that BP remain in the kernels after the heat treatment processes, thermodynamic equilibrium analysis was performed. Above 450C, boron would melt and vaporize during the heat treatment processes, so it was found that the boron mixed fuel kernel fabrication is difficult. On the other hand, it was found that gadolinium, erbium, and hafnium would change to solid oxides that do not melt and vaporize even at 2000C, and there was no problem with manufacturability of the BP-mixed fuel kernel.
Kato, Atsushi; Mukaida, Kyoko
Proceedings of 2019 International Congress on Advances in Nuclear Power Plants (ICAPP 2019) (Internet), 10 Pages, 2019/05
Improvement of economic competitiveness is a part of key requirement in the project. By adopting innovative technologies to reduce plant commodities, JSFR could achieve economic competitiveness compared with LWR. After the Fukushima-Dai-ichi Nuclear Power Plants accident, safety enhancement measures were added on LWR in Japan mainly against external hazards. In parallel, Safety Design Criteria and Guidelines (SDC/SDG) for SFR were constructed in the framework of Generation IV international forum. Design studies of JSFR were carried out responding to GIF SDC/SDG and lessons learn from the Fukushima accident. This reports an impact of recent safety design enhancements on JSFR construction cost. Safety design enhancement adopted in JSFR.
Iketani, Shotaro; Yokobori, Tomohiko; Ishikawa, Joji; Yasuhara, Toshiyuki*; Kozawa, Toshiyuki*; Takaizumi, Hirohide*; Momma, Takeshi*; Kurosawa, Shingo*; Iseda, Hirokatsu; Kishimoto, Katsumi; et al.
JAEA-Review 2018-016, 46 Pages, 2018/12
Japan Atomic Energy Agency (JAEA) adopts melting process for the waste processing and packaging method of radioactive miscellaneous solid waste in NSRI because melting process is effective in radioactivity evaluation, volume reduction, and stabilization treatment. Metal melting processing facilities, Incinerator, and Nonmetal melting processing facilities (hereinafter referred to as melting process facilities) have taken lots of safety measures, including measures for preventing the recurrence of the fire accidents. To exchange opinions and discuss the validity of these measures and so on with internal personnel and external experts, "Discussions on Melting Process Facilities" was held. As a document collection, this paper summarizes presentation materials of discussion meetings. Presentation materials describe "Outline of AVRF", "Safety measures in the melting facilities in WVRF", "Operation management of the melting facilities in WVRF", "Comparison of the past accident cases between facilities in and outside Japan and WVRF", and "Introduction of past accident cases and safety measures in other facilities from each committee".
Tsuchiya, Kunihiko; Takeuchi, Tomoaki; Komanome, Hirohisa*; Miura, Kuniaki*; Araki, Masanori; Ishihara, Masahiro
Nihon Hozen Gakkai Dai-13-Kai Gakujutsu Koenkai Yoshishu, p.375 - 378, 2016/07
no abstracts in English
Tatsumoto, Hideki; Aso, Tomokazu; Hasegawa, Shoichi; Ushijima, Isamu*; Kato, Takashi; Otsu, Kiichi*; Ikeda, Yujiro
AIP Conference Proceedings 823, p.753 - 760, 2006/05
As one of the main experimental facilities in J-PARC, an intense spallation neutron source (JSNS) driven by proton beam power of 1 MW is constructed. In JSNS, cryogenic hydrogen at supercritical pressure is selected as a moderator. The total nuclear heating at the moderators is estimated to be 3.7 kW. A cryogenic hydrogen system to cool the moderators has been designed. As the most severe off-normal event for cryogenic hydrogen system, it is considered that the cryogenic hydrogen leaks when the pipe is cracked. In such a case, the hydrogen must be discharged safely as soon as possible. An analytical code that simulated the pressure change during hydrogen leak was developed. The pressure rise analysis for various sized cracks was performed, and then the required size of safety equipment was determined. It was found from the analysis that a safety valve of -42.7 mm and a rupture disk with the diameter of 37.1 mm can discharge hydrogen safely.
Nakanoya, Takamitsu; Abe, Shinichi; Matsuda, Makoto; Nishio, Katsuhisa; Hanashima, Susumu; Ichikawa, Shinichi; Tsukihashi, Yoshihiro; Takeuchi, Suehiro; Ishiyama, Hironobu*; Jeong, S.-C.*; et al.
Dai-17-Kai Tandemu Kasokuki Oyobi Sono Shuhen Gijutsu No Kenkyukai Hokokushu, p.123 - 126, 2004/00
no abstracts in English
Kanamori, Masashi
JNC TN8440 2001-023, 110 Pages, 2001/12
The business of the Safety administration Division became a wide range such as the management of a labor safety health, the crisis management, the security and the management of an entrance, and the business of the following concerning the Tokai Works, the protection of nuclear materials, the business of the sanction, the nuclear material safeguards, the transport of nuclear materials and the business of a quality assurance. For the purpose of summarizing these businesses and utilizing the data concerning the businesses, the report about the businesses achievement has been periodically drawn up as quarter news since 2001, when the Safety Administration Division was established. This report describes about the business achievement of the second quarter news from July to September in 2001.
Kanamori, Masashi
JNC TN8440 2001-015, 100 Pages, 2001/09
As a consequence of this reorganization, the business of the Safety Administration Division became a wide range such as the management of a labor safety health, the crisis management, the security and the management of an entrance, the business of the sanction concerning the Tokai Works, the protection of nuclear materials, the nuclear material safeguards, the transport of nuclear materials and the business of a quality assurance. In the respect of the purpose of summarizing these businesses and utilizing the data concerning the businesses, the report about a business achievement was determined to make.
Onuki, Kaoru; Akino, Norio; Shimizu, Saburo; Nakajima, Hayato; Higashi, Shunichi; Kubo, Shinji
JAERI-Tech 2001-032, 63 Pages, 2001/03
no abstracts in English
Adachi, Junichi*; Kaminaga, Masanori; Sasaki, Shinobu; Hino, Ryutaro
JAERI-Tech 2000-068, 86 Pages, 2000/11
no abstracts in English
JNC TN9410 2000-003, 52 Pages, 1999/12
In May, 1999, disassembly and cleansing of sodium residues contained in the large cold trap (50MWSG) were carried out. Two cold trap units, one from the primary sodium loop and the other from the for the secondary sodium loop were disassembled and cleaned. This report describes the procedures, methods, and tasks under taken in the clean-up effort, including countermeasures for safe handling of sodium. The disassembly of the cold trap was based an information regarding similar cleansing activities external to JNC. There was also same a priori knowledge of the type and amount of sodium-laden residues. As this result, we conducted disassembly and cleansing task as provisionally planned. In fact we learned that disassembly methods for the specific components could be conducted in an aerated atmosphere. We thus gained additional disassembly and sodium cleansing experience under manageable and safe conditions.
; Kano, Yutaka; ; Shindo, Katsutoshi
JNC TN9410 2000-001, 20 Pages, 1999/12
The 12th periodic inspection had been executed at the experimental fast reactor JOYO from February 24,1998 to June 28,1999. This inspection had been extended about three months because it was addtion to the work for the safety countermeasure. The result of collective dose equivalent was 263.92 man*mSv, whereas, the expected collective dose equivalent was about 407 man*mSv in the whole period of this inspection. It was confirmed that this inspection was carried out with the suitable radiation protection programmes. In this report, provided in 12th periodic inspection, were described with taking the results of the past periodic inspections into consideration.
Takebe, Shinichi; Komiya, Tomokazu
JAERI-Tech 99-068, p.46 - 0, 1999/09
no abstracts in English
Okada, Toshio; *; *; *; *; Miyake, Osamu; Sasaki, Shuichi
PNC TN1410 94-006, 57 Pages, 1994/11
no abstracts in English
Dai-20-Kai Nihon Aisotopu, Hoshasen Sogo Kaigi Hobunshu, p.207 - 211, 1992/00
no abstracts in English